SEIP » Home Page Article » November 2019 » Concluding Stakeholder Consultation Workshop on “Gaps and Needs Analysis on Industrial Wastewater Management”  · 

Concluding Stakeholder Consultation Workshop on “Gaps and Needs Analysis on Industrial Wastewater Management”

To discuss on the results of the Gaps and Needs Analysis studies on various Outputs of the SEIP II project, a stakeholder consultation workshop on “Gaps and Needs Analysis on Industrial Wastewater Management” was organised on Friday, 22nd November 2019, 09:30 to 17:00 hrs in New Delhi by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH together with Ministry of Environment, Forests & Climate Change (MoEFCC) and Central Pollution Control Board (CPCB).

While the consultants corresponding to each of the four outputs had completed an initial assessment of gaps, there was a need to verify this with stakeholders at the ground level. The objective of the workshop was to share the findings and obtain feedback on the identified gaps and needs pertaining to legal framework, institutional framework, incentive mechanisms and knowledge products (guidelines, methods, resource efficiency approaches etc.). The finalised needs will help the SEIP II project to prioritise them and start working on solutions in consultation with MoEFCC, CPCB and other partner organisations in the States of Uttarakhand, Bihar and West Bengal.

Each of the outputs presented a baseline assessment and identification of key gaps. The series of presentation made were as follows:

  • Presentation on SEIP II and workshop agenda by GIZ
  • Presentation on gap analysis of legal and regulatory frameworks related to sustainable industrial wastewater management by EY
  • Presentation on gap analysis of the organizational structure, processes and procedures in relation to industrial wastewater management by Deloitte
  • Presentation on gap analysis of incentive mechanisms for sustainable industrial wastewater management by CRIS
  • Presentation on gap analysis of knowledge products for sustainable industrial wastewater management by NPC

A detailed report of the workshop is attached.

Icon Workshop Report (1.6 MB)
file in pdf